S-CB-1

CABLE BARRIER PLACEMENT
S-CB-1

(Click image to open PDF)

Latest Revision Note

01/09/2024    REVISED TYPICAL PLACEMENT LOCATIONS FOR CABLE MEDIAN BARRIER DRAWINGS.

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
S-CB-2 HIGH TENSION CABLE BARRIER FOR HIGH TENSION CABLE BARRIER (HTCB)
S-GRT-2P EARTH PAD FOR TYPE 38 AND TYPE 21 TERMINAL FOR EDGE OF EARTH PAD
T-M-18 FLEXIBLE DELINEATOR DETAILS FOR CABLE BARRIER DELINEATOR
     

Related Item Numbers

ITEM NO. U/M DESCRIPTION
705-06.40 L.F. CABLE BARRIER (MASH TL-3)
705-06.41 EACH CABLE BARRIER ANCHOR (MASH TL-3)
705-06.50 L.F. CABLE BARRIER (MASH TL-4)
705-06.51 EACH CABLE BARRIER ANCHOR (MASH TL-4)

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
03-07-2013 |06-28-2019 | 10-29-2021 | 07-07-2023 | 01-09-2024
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM