2021 Flood Recovery - Humphreys & Hickman County Bridges
This project includes bridge repair and replacements that were impacted or caused by the 2021 flood.
Current Status: See the Project Milestones section to view the current status of each bridge.
Key Project Milestones
LOCATION |
SCOPE OF WORK |
ANTICIPATED LETTING |
State Route 13 (Church Street) (Viaduct bridge) |
Bridge Replacement |
On or After 2028 |
|
|
|
State Route 1 (US 70) bridges over Trace Creek (near Scepter Road) |
Bridge Replacement |
In Progress Completion Date: WB Bridge Completed EB Bridge: June 2025 |
Bakerville Road bridge over Duck River |
Bridge Replacement |
Spring 2025 |
East Blue Creek Road bridge over Blue Creek |
Bridge Replacement - Construction of a 2-lane, 100-foot three span prestressed concrete girder bridge with shoulders |
Construction Complete |
Blue Creek Road bridge over Blue Creek |
Bridge Replacement - Construct a 2-lane 100-foot three span prestressed concrete girder bridge with shoulders. |
Construction Complete |
Tatum Lane bridge over Blue Creek |
Bridge Replacement. The proposed structure will be a two span pre-stressed concrete structure, with a proposed alignment shift of twenty-one feet to the east. The project will also include utility relocation |
Construction Complete |
Weed Lane bridge over Blue Creek |
Bridge replacement |
Construction Complete |
State Route 230 over Hurricane Creek and Overflow |
Bridge replacement |
Construction Complete |
Tumbling Creek Road bridge over Tumbling Creek |
Bridge Replacement. Construction of a 2-lane 140-foot three-span prestressed concrete girder bridge with shoulders. |
Construction Complete |
Cedar Grove Road over Hurricane Creek |
Bridge Replacement. The proposed bridge is to be a three-hundred (300) feet long, three (3) span concrete beam bridge with an out-to-out width of twenty-five (25) feet three (3) inches. The proposed grade of the bridge will be approximately one (1) foot higher than the existing structure and the exiting centerline will be maintained. |
2027 |
Interstate 40 Bridges over Buffalo River & Squeeze Bottom Lane |
Bridge replacement |
In Progress Completion Date: December 2028 |
Crockett Murphree Lane bridge over I-40 (mile marker 145) |
Bridge Replacement |
On or After 2028 |
State Route 320 between Bucksnort and Nunnelly |
Bridge replacement |
Construction Complete |