D-PB-3
INDUCED TRENCH SOIL EMBANKMENT FOR PIPE CULVERT INSTALLATIONRelated Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
203-01 | C.Y. | ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) | ONLY FOR SOIL EMBANKMENT TO REMAIN IN PLACE |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
01-02-2013 | 06-28-2019 | 11-30-2020 |