Natural Stream Design
Revised: Noverber 9, 2021NOTE - This page an all of its child pages on the menu to the left have been transitioned to the Engineering Production Support web site. These pages will remain temporarily but will no longer be updated. Please update your links.
DRAWING | RELATED IB | REVISION DATE | DESCRIPTION |
05/01/2020
|
LONGITUDINAL STONE TOE
|
||
05/01/2020 | BOULDER CLUSTERS
|
||
05/01/2020 | BOULDER CROSS VANE
|
||
05/01/2020 | BOULDER CROSS VANE WITH STEP
|
||
05/01/2020 | BOULDER W-WEIR
|
||
05/01/2020 | BOULDER VANES AND J-HOOK
|
||
11/30/2020 | LOG VANES, ROOT WADS, AND BOULDER J-HOOK
|
||
11/30/2020 | LOG AND BOULDER STEP POOLS | ||
05/01/2020 | BOULDER RIFFLES
|
||
11/30/2020 | LOG RIFFLES
|
||
05/01/2020 | CONSTRUCTED ALLUVIAL RIFFLE
|
||
05/01/2020 | SUBSTRATE RESTORATION
|
||
05/01/2020 | CLAY CHANNEL PLUG
|
||
D-NSD-32 | 05/01/2020 | WOOD TOE WITH GEO-LIFTS | |
D-NSD-32A | 05/01/2020 | BOULDER TOE WITH GEO-LIFTS | |
D-NSD-33 | 05/01/2020 | COIR FIBER EROSION CONTROL BLANKET AND COIR FIBER ROLLS | |
D-NSD-34 | 05/01/2020 | LIVE STAKES AND LIVE SILTATION | |
D-NSD-35 | 05/01/2020 | LIVE FASCINES | |
D-NSD-36 | 05/01/2020 | BRUSH MATTRESS | |
D-NSD-37 | 05/01/2020 | SPECIAL NOTES FOR NATURAL STREAM DESIGN | |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 26, 2024 at 12:18 PM