T-WZ-PBR2
DETAILS FOR WORK ZONE CHANNELIZATION DEVICESRelated Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
T-WZ-PBR1 |
INTERCONNECTED PORTABLE BARRIER RAIL |
FOR DETAILS REGARDING INTERCONNECTED PORTABLE BARRIER RAIL |
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
712-04.50 | EACH | BARRIER RAIL DELINEATOR | |
713-02.14 | EACH | FLEXIBLE DELINEATOR (WHITE) | |
713-02.15 | EACH | FLEXIBLE DELINEATOR (YELLOW) | |
713-02.16 | EACH | FLEXIBLE TYPE II OBJECT MARKER | |
713-02.30 | EACH | FLEXIBLE TUBULAR DELINEATOR | |
713-02.33 | EACH | FLEXIBLE DELINEATOR (RED) | |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
06-28-2019 | 02-28-2020 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 12, 2024 at 11:37 AM